Beach Path Upgrade Progress Report

The work on the beach path on Reed Road has been completed. The contractor’s original proposal was modified slightly to include a mix of sand and gravel on the path to make it a little easier on bare feet. Below are a couple of photos of the new bridge railings and the newly widened and graveled path. There is also a new album in the Photo Album page link on the right with more pictures of the paths both before and after the upgrades.

After receiving feedback from other members, the Board has also requested a bid from the same contractor to do some work on the other path between 1st Street and Reed Road.  This path is badly eroded, and the steps at the top need work and a handrail. If this path can also be upgraded within the funds available in our special beach path fund the Board will proceed with that work, as well.